  1. Vertical jet-fuel storage tank under construction at Sharm El-Sheikh

    1999

    Where It Began

    The revamp of the aircraft refuelling system at Sharm El-Sheikh International Airport — the earliest project in the record.

  2. The fuelling depot and storage tank at Hurghada International Airport

    2001

    The Hurghada Depot

    A new fuelling depot at Hurghada International Airport, built around a 13,300 m³ storage tank — a depot that still anchors the airport's fuel supply.

  3. Hydrant pipeline installation for Cairo Airport Terminal 3

    2008

    Cairo TB3 & Abuja

    The 15,800 m Terminal 3 hydrant at Cairo (in joint venture with Egypt Gas) — the longest run in the record — and a new 2,250 m³ fuelling depot at Abuja Airport, Nigeria.

  4. Multi-diameter hydrant fuelling system at Borg El-Arab Airport, Alexandria

    2009

    Borg El-Arab

    A new multi-diameter hydrant fuelling system at Borg El-Arab Airport, Alexandria, alongside depots and stations at Taba and Hurghada.

  5. 2010–2011

    Across Borders

    The first international wave — a pipeline network for KAF in Dubai and re-fuelling units for the Djibouti Air Force station.

  6. Hydrant mains for the Cairo Airport Terminal 2 fuelling system

    2016

    Cairo TB2

    A new 24″ and 14″ hydrant system for Cairo Airport Terminal 2, with cathodic protection, leak detection and full SCADA.

  7. Fuelling canopies and metering skids at the Dirab Airbase fuel station, Riyadh

    2017–2019

    Into the Kingdom

    Jet A1 & JP8 fuel stations for the Khashm Alan and Dirab military airports in Riyadh, Saudi Arabia — double-skin storage, deep-well cathodic protection and PLC/SCADA.

  8. Hydrant pipeline laid toward the terminal at Malabo International Airport

    2020

    Malabo

    An 8″ hydrant system with pit valves and cathodic protection at Malabo International Airport, Equatorial Guinea.

  9. 2021

    New Administrative Capital

    Eight fuel-oil-system projects across the New Administrative Capital, for Redcon, Al-Marasem, Hassan Allam / Orascom, Petrojet, the Arab Contractors, Talaat Moustafa Group, NUCA and the Saint Catherine Development Project.

  10. The EPC fuel depot at Assiut International Airport

    2022

    Assiut

    A new EPC fuel depot at Assiut International Airport — the site of our live facility footage.

  11. JET-A1 storage tanks at the Al-Alamein International Airport fuel depot

    2023–2025

    Al-Alamein

    The EPC fuel depot at Al-Alamein International Airport — three JET-A1 tanks totalling 1.2 million litres, with a 14″ hydrant of two 1,850 m runs.

  12. Recent

    Beyond Fuel

    The Imam Al-Zahaby mosque and education complex in New Cairo, and a 30 kW rooftop solar station at Al-Andalus International School — the same discipline, new sectors.