
Scale of delivery
Built Across Borders
Every figure below comes from the delivered record — real airports, real capacities, from a 1999 refuelling revamp to depots commissioned in 2022.
- 37
- Delivered Projects
- 6
- Countries
- 25+
- Years' EPC Delivery
- 13,300 m
- Longest Hydrant Run
The atlas
The Photographed Record
Every project below is shown as built — real site photography, grouped by sector. Filter to a sector with the bar below, then follow any project through to its full record.
Sector 01 — Aviation
Aviation fuel infrastructure
14 projects · Egypt · Eq. Guinea · KSA · Nigeria
Egypt — the home network10
01Al-Alamein Fuel Depot
Al-Alamein · 2023–2025
02Assuit Fuel Depot
Assuit · 2022
03Cairo Airport — Terminal 2 Hydrant System
Cairo · 2016
04Hurghada Airport — Jet Fuel Hydrant System
Hurghada · 2014–2018
05Sharm El-Sheikh — Main Jet Fuel Station Upgrade
Sharm El-Sheikh · 2010
06Borg El-Arab Airport — New Hydrant System
Borg El-Arab · 2009
07Taba Airport — Main Fuelling Depot
Taba · 2009
08Cairo Airport — Terminal 3 Hydrant System
Cairo · 2008
09Hurghada Airport — New Fuelling Depot
Hurghada · 2001
10Sharm El-Sheikh — Refuelling System Revamp
Sharm El-Sheikh · 1999
Sector 02 — MEP
General MEP works
2 projects · Egypt
Sector 03 — Solar
Solar energy
1 project · Egypt
Sector 04 — General Building
General building
6 projects · Egypt














