Al Majd · Warner Lewis
We Flow Over Ages
Hydrant pipeline installation at Cairo Airport Terminal 3

Project · Hydrant system

Cairo Airport — Terminal 3 Hydrant System

The longest run in the portfolio — a 14″ hydrant network of 15,800 m with pumping, metering, cathodic protection and reception/loading stations, delivered in joint venture with Egypt Gas.

Location
Cairo International Airport · JV with Egypt Gas
Type
Hydrant system
Delivered
2008
15,800 m hydrant
Defining Spec
Hydrant system
Type
2008
Delivered
Egypt
Region

Scope of work

What We Delivered

  • 01Hydrant 14″ · 15,800 m
  • 02JET-A pumping stations
  • 03Flow metering systems
  • 04Reception & loading stations
  • 05Cathodic protection
  • 06Civil works

Your Project, Delivered to Spec.