The Buried Artery.
The hydrant network is the buried artery of an airport: Jet A1 pipelines, pit valves and valve chambers feeding aircraft on stand, receipt to wing. Engineered, installed and commissioned to JIG and EI standards.
Capabilities
From Receipt to Wing
A buried loop of pipelines, valves and pumps, monitored and protected end to end.
- 0124", 14", 10" and 6" pipelines
- 02Pit valves and valve chambers
- 03Cathodic protection
- 04Pumping and metering
- 05SCADA and instrumentation
Reference projects
Hydrant Networks Delivered
Case studyCairo · Case study
Cairo Airport TB2 Hydrant
A new 24″ and 14″ hydrant system for Terminal 2, with cathodic protection, an emergency system, leak detection and full SCADA — installed alongside live operations.
Read the case study
Alexandria · Project
Borg El-Arab Hydrant System
A new Jet A1 hydrant fuelling system at Borg El-Arab Airport, with 14″, 10″ and 6″ pipelines, pit valves and all related civil works.